Deck Framing Code: Spans, Ledger Attachment and Connections
Joist spans, beam plies, cantilevers, lateral restraint, ledger bolts and hold-downs: what California's deck framing code requires, why the 60 psf live load rewrites…
Joist spans, beam plies, cantilevers, lateral restraint, ledger bolts and hold-downs: what California's deck framing code requires, why the 60 psf live load rewrites…
A deck up to 30 inches above grade needs no guard, but the tape has to sweep three feet out from the edge. Here…
A deck footing is the one part that cannot be fixed later. Here is how the code sizes it from tributary area and soil…
Post size now turns on height, species and tributary area, and California's 60 psf live load rewrites the printed charts. Here is what the…
Play at the top of a guard is not wear. It is the visible end of a connection that gave up out of sight.…
Yes, it can. Not because of the fabric, but because of what the fabric stops from happening. Here is the 20 percent moisture threshold,…
California designs decks for 60 psf, not the 40 psf every national span table assumes. Here are the permit, footing, framing, and ledger rules…
National guides say 36 inches. Build to 36 in California and the inspector sends you back. Here is where the 42-inch figure comes from…
A bottom step three-quarters of an inch shallow can fail an entire flight. Here is what California’s deck stairs code sets for rise, run,…
The 15 structural and safety points every homeowner and inspector should check on a deck, grouped by system from the house connection to the…
Your deck inspection report is a safety roadmap, not paperwork. Here is how to read every severity rating and finding, and exactly what to…
Most deck failures start out of sight, in the framing. Here is how a deck framing inspection finds hidden rot in ledgers, joists, and…