Balcony & Deck Projects Across Greater Sacramento
Completed SB 721 and SB 326 inspections, structural repairs, full reconstructions, and waterproofing systems — documented case by case, from the first finding to the final sign-off.
Featured Case Studies
Every project below is real work by our in-house crew — inspected, repaired, and signed off under one license. Filter by service to see how we handle jobs like yours.
Apartment Deck Reconstruction
Sacramento, CA
Full structural rebuild with new framing, waterproofing & railings
Trex Composite Deck Rebuild After a Failed Inspection
Folsom, CA
A Folsom fourplex failed its SB 721 inspection with soft decking and undersized joists. The owner upgraded to Trex composite decking over a rebuilt, code-compliant frame — a deck that will outlast the next two inspection cycles.
- Demolition of failed decking
- Joist replacement & reinforcement
- Trex composite decking installation
- Redwood fascia & trim
Elevated Walkway Waterproofing for a 12-Unit Apartment Building
Rancho Cordova, CA
Cracked, chalking walkway coatings were letting water into the framing of a Rancho Cordova apartment building. A full Westcoat ALX rebuild sealed the walkways before the damage reached structural members.
- Moisture survey of all walkways
- Failed coating removal & surface prep
- Westcoat ALX multi-layer application
- Drainage & scupper correction
Apartment Stair & Landing Replacement for SB 721 Compliance
West Sacramento, CA
Exterior stairs and landings at a West Sacramento apartment building failed SB 721 with rusted connections and rotted stringers. We rebuilt both stair systems to current code without ever closing off tenant access.
- SB 721 inspection of stairs & landings
- Temporary egress routing
- Stringer & landing framing replacement
- Waterproofing of landing surfaces
Condo Balcony Waterproofing & Railing Upgrade (SB 326)
Citrus Heights, CA
After its SB 326 inspection, a Citrus Heights condominium association repaired eight balconies flagged for membrane wear and loose railing posts — completed in one week, documented for the next nine-year cycle.
- Repair scope from SB 326 findings
- Membrane replacement on 8 balconies
- Railing post re-anchoring
- Sheet-metal flashing replacement
Your Property Could Be Next
From SB 721 and SB 326 inspections to full reconstruction — we handle it all in-house. Get a free compliance check for your property today.